It consists of four main parts, for bridge structure the traveling mechanism, the trolly and the electric equipment. The bridge is welded structure of boxed-type girder, individual drives are adopted for traveling mechanism on each end beam of the crane.All movements of the crane are controlled in the cabin, either rigid shapes of steel (angles or tees) or flexible insulated cable shall be selected to be utilized as runway conductors and proposed in the order by the purchaser.Max and Min value of environment temperature, the short of power supply, the voltage and the other data shall accord to the buyer’s demand.
Rated Capacity | 3-25T |
Span | 10-30m |
Lifting Height | 30m or Required |
Work Class | A3-A7 |
Rated Capacity | 3-25T |
Span | 10-30m |
Lifting Height | 30m or Required |
Work Class | A3-A7 |